Notices to Mariners
August 27, 2021
Safety First, Service Always
Monthly Summary
of Temporary and Preliminary Notices
Notices to Mariners – Monthly Summary of Temporary and Preliminary Notices
Edition No. 08/2021
Aussi disponible en français :
Avis aux navigateurs – Sommaire mensuel des avis temporaires et préliminaires
Édition n° 08/2021
Published under the Authority of:
Canadian Coast Guard Programs
Aids to Navigation and Waterways
Fisheries and Oceans Canada
Montreal, QC H2Y 2E7
For more information, contact Notmar.XNCR@dfo-mpo.gc.ca.
© Her Majesty the Queen in Right of Canada,
as represented by the Minister of Fisheries, Oceans
and the Canadian Coast Guard, 2021.
Cat. No. Fs151-19E-PDF (Electronic PDF, English)
ISSN 2561-5106
Cat. No. Fs151-19F-PDF (Electronic PDF, French)
ISSN 2561-5114
Explanatory Notes
Geographical positions refer directly to the graduations of the largest scale Canadian Hydrographic Service chart (unless otherwise indicated).
Bearings refer to the true compass and are measured clockwise from 000° (North) clockwise to 359°; those relating to lights are from seaward.
Visibility of lights is that in clear weather.
Depths - The units used for soundings (metres, fathoms or feet) are stated in the title of each chart.
Elevations are normally given above Higher High Water, Large Tide (unless otherwise indicated).
EXPLANATION OF TEMPORARY AND PRELIMINARY NOTICES TO MARINERS
Certain Notices to Mariners appearing in the monthly editions have a (T) or (P) appended to the regular number. These letters indicate that the information contained in the notice is of a temporary or preliminary nature, respectively.
TEMPORARY (T) NOTICES
If a temporary change in conditions affecting navigation exists and if the change will be effective for a period of over three months, a temporary (T) notice will be published. Temporary changes which are effective for periods of less than three months will not normally be published (unless it is of exceptional interest). Otherwise, information will be promulgated as a Navigational Warning (NAVWARN) by the Canadian Coast Guard Marine Communications and Traffic Services (MCTS) Centre(s) in the affected area. (T) notices will be cancelled as necessary.
Please note that (T) notices with an end date will be automatically cancelled once the end date has passed. In the event of a change to these notices, a new Notice to Mariners will be issued.
PRELIMINARY (P) NOTICES
a. When important changes affecting navigation are to take place in the near future, a Notice to Mariners describing the change will be published, so that mariners will have advance information on the change. Such notices will be designated (P).
b. When a change in conditions affecting navigation has taken place but full information is not available, a preliminary (P) notice giving available information will be published. This notice will be followed by a regular notice when complete information becomes available. The regular notice will cancel the (P) notice.
c. When a change has taken place which is too complex to describe in a written notice, a (P) notice giving general information will be published. This notice will explain that follow up action will be taken to update charts by publishing patch corrections, new editions or new charts.
Please note that following the expiry of the 90-day comment or objection period, (P) notices describing proposed changes or intention to discontinue will be automatically cancelled. In the event of a change to these notices, a new Notice to Mariners will be issued.
ACTION REQUIRED ON RECEIPT OF (T) & (P) NOTICES
It is not customary to make permanent corrections to charts and publications from (T) & (P) notices. On receipt of such notices, the information they contain should be noted in pencil on the affected charts and/or publications.
CAUTION
Mariners are reminded that charts and publications are not corrected from (T) & (P) notices when purchased from suppliers. For the list of charts affected by (T) & (P) notices, please refer to the index on page ii of this publication.
INDEX OF (T) & (P) NOTICES
INDEX OF CHARTS AFFECTED BY (T) & (P) NOTICES
1236 | 2044 | 2315 | 4379 |
1310 | 2058 | 3056 | 4394 |
1316 | 2060 | 3475 | 4426 |
1430 | 2067 | 3490 | 4679 |
1509 | 2077 | 3546 | 4921 |
1513 | 2085 | 3980 | 6022 |
1550 | 2086 | 4118 | 6108 |
2006 | 2123 | 4233 | 7661 |
2017 | 2181 | 4234 | |
2021 | 2291 | 4236 |
Newfoundland and Labrador Coast
Temporary Notices
No notices applicable for this edition.
Preliminary Notices
Atlantic Region
Comment
Submission |
Comments should be directed to the following: |
*606(P)/21Hawkes Bay, Port Saunders, Back Arm – Light Buoy to be Established
Reference chart: 4679
The Canadian Coast Guard proposes to permanently establish the following aid to navigation:
Aid Name |
LL # |
Position |
Notes |
Barbace Point |
211.15 |
50° 44’ 00.2”N |
Establish a North cardinal buoy equipped with a white
lantern with flash characteristics: |
Initial publication date: Friday, June 25, 2021
Comment submission
deadline: Thursday, September 23, 2021
(N2021-050)
Atlantic Coast
Temporary Notices
*716(T)/19Rivière Ristigouche / Restigouche River – Federal Wharf Closed to Navigation
Reference chart: 4426
The federal wharf at Miguasha is closed to navigation. For
reasons of safety and because of the collapsing risk, it is
not permitted to berth at the wharf or to come closer than 20
metres from these structures.
For more information, please contact the regional
representative of port operations at Transport Canada, Quebec
region, Mme Myriam Rouleau at 418-446-8402.
(NAVWARN NW-Q-0318-16)
*111(T)/21Rivière des Prairies – Construction Operations
Reference chart: 1509
Repair work is taking place 24 hours a day at the Pie-IX bridge
as of August 17th, 2020.
Buoys, jetties, and a turbidity curtain are in place.
(NW-Q-1112-20)
*206(T)/21Plans, Baie des Chaleurs/Chaleur Bay (côte nord/north shore) – Federal Wharf Closed to Navigation
Reference: Notice *1118/19 is cancelled.
Reference chart: 4921
The federal wharf at Chandler is closed to navigation. For
safety reasons, it is not permitted to berth at the
wharf.
For more information, please contact Mr. Simon Bilodeau at
Transport Canada at 418-563-2325 or by email at the following
address: simon.bilodeau@tc.gc.ca.
(NAVWARN NW-Q-1580-16)
*318(T)/21Pointe des Monts aux/to Escoumins – Scientific Moorings
Reference chart: 1236
Over 80 underwater scientific moorings have been placed in the area delimited by the following positions:
Pt 1: |
49° 18’ 00.7”N |
067° 40’ 03.6”W |
Pt 2: |
49° 18’ 12.0”N |
067° 43’ 30.8”W |
Pt 3: |
49° 17’ 31.3”N |
067° 43’ 32.4”W |
Pt 4: |
49° 17’ 25.3”N |
067° 40’ 15.5”W |
(NW-Q-0968-20)
*411(T)/21Port de Montréal – Wharf Repair Work
Reference chart: 1310
Repair work on the wharf in section 28 is underway. Barges are on site. Mooring is prohibited.
Position 1: |
45° 31’ 12.9”N |
073° 32’ 42.1”W |
Position 2: |
45° 31’ 20.7”N |
073° 32’ 39.6”W |
(NW-Q-0288-21)
*508(T)/21Port de Québec – Wharf Construction
Reference chart: 1316
Wharf construction is taking place at wharves 93 and 94,
Monday to Friday from 1200 UTC until 2300 UTC.
(NW-Q-1975-21)
Preliminary Notices
Atlantic Region
Comment
Submission |
Comments should be directed to the following: |
*607(P)/21Cape Canso to / à Country Island – Notice of Proposed Changes
Reference chart: 4233
The Canadian Coast Guard proposes to permanently change the following aids to navigation:
Aid Name |
LL # |
Position |
Proposed Changes |
Split Rock |
639.5 |
45° 07’ 08.0”N |
Reduce the size of the buoy. |
Seal Ledge |
639.55 |
45° 07’ 43.6”N |
Establish a port hand buoy equipped with a green lantern with flash characteristics: Fl 0.5 s, Ec 3.5 s. |
Brandy Ledge |
639.7 |
45° 06’ 54.4”N |
Discontinue buoy. |
Brandy Ledge |
639.8 |
45° 06’ 50.3”N |
Establish a South cardinal buoy equipped with a white
lantern with flash characteristics: |
Coddles Harbour |
5640.09 |
45° 09’ 34.5”N |
Add green lantern with flash characteristics: |
Coddles Harbour |
5640.12 |
45° 08’ 13.7”N |
Add green lantern with flash characteristics: |
Graham Shoal |
5640.13 |
45° 08’ 45.5”N |
Reposition buoy to the following position: |
Coddles Harbour |
5640.2 |
Position to be determined |
Establish an unlit starboard hand buoy. |
Initial publication date: Friday, June 25, 2021
Comment submission
deadline: Thursday, September 23, 2021
(G2021-025)
*608(P)/21Country Island to / à Barren Island – Notice of Proposed Changes
Reference chart: 4234
The Canadian Coast Guard proposes to permanently change the following aids to navigation:
Aid Name |
LL # |
Position |
Proposed Changes |
Middle Ground |
636.2 |
45° 07’ 32.0”N |
Increase intensity of lantern. |
Drum Head |
5636.01 |
45° 08’ 36.0”N |
Reposition buoy to the following position: |
Drum Head |
5636.02 |
45° 08’ 40.0”N |
Increase size of the buoy. |
Initial publication date: Friday, June 25, 2021
Comment submission
deadline: Thursday, September 23, 2021
(G2021-025)
*806(P)/21St. Marys Bay – Notice of Proposed Changes
Reference chart: 4118
The Canadian Coast Guard proposes to permanently change the following aids to navigation:
Aid Name |
LL # |
Position |
Proposed Changes |
Grand Passage Shoal buoy HAA |
5220.5 |
44° 15’ 51.0”N |
Add white lantern with flash characteristics: Fl(2) 5s. |
North West Ledge buoy M6 |
5251.6 |
44° 19’ 18.0”N |
Add red lantern with flash characteristics: |
Initial publication date: Friday, August 27, 2021
Comment submission
deadline: Thursday, November 25, 2021
(F2021-040)
*807(P)/21Taylors Head to / à Shut-in Island – Notice of Proposed Changes
Reference chart: 4236
The Canadian Coast Guard proposes to permanently change the following aids to navigation:
Aid Name |
LL # |
Position |
Proposed Changes |
Petpeswick buoy HH6 |
5565.02 |
44° 41’ 10.0”N |
Change aid ID from HH6 to HH4. |
Petpeswick buoy HH7 |
5565.03 |
44° 41’ 18.7”N |
Change aid ID from HH7 to HH5. |
Petpeswick buoy HH8 |
5565.04 |
44° 42’ 14.6”N |
Add a green lantern with flash characteristics: |
Petpeswick buoy HH9 |
5565.05 |
44° 42’ 27.1”N |
Add a green lantern with flash characteristics: |
Initial publication date: Friday, August 27, 2021
Comment submission
deadline: Thursday, November 25, 2021
(F2021-018)
*808(P)/21Liverpool Harbour – Notice of Proposed Changes
Reference chart: 4379
The Canadian Coast Guard proposes to permanently change the following aid to navigation:
Aid Name |
LL # |
Position |
Proposed Changes |
Brooklyn Pier light buoy UM52 |
408.5 |
44° 02’ 38.4”N |
Remove lantern. |
Initial publication date: Friday, August 27, 2021
Comment submission
deadline: Thursday, November 25, 2021
(F2021-039)
*809(P)/21LaHave River: West Ironbound Island to / à Riverport – Notice of Proposed Changes
Reference chart: 4394
The Canadian Coast Guard proposes to permanently change the following aids to navigation:
Aid Name |
LL # |
Position |
Proposed Changes |
Crooked Channel |
421.2 |
44° 13’ 31.9”N |
Establish a starboard hand buoy in TN61’s former position, equipped with a red lantern with flash characteristics: Fl 0.5 s, Ec 3.5 s. |
Crooked Channel |
421.5 |
44° 13’ 50.9”N |
Establish a port hand buoy in TN56’s former position, equipped with a green lantern with flash characteristics: Fl 0.5 s, Ec 3.5 s. |
Crooked Channel |
423.6 |
44° 14’ 03.9”N |
Discontinue buoy. |
Crooked Channel |
423.8 |
44° 14’ 03.9”N |
Establish a starboard hand buoy in TN51’s former position, equipped with a red lantern with flash characteristics: Fl 0.5 s, Ec 3.5 s. |
West Dublin |
424.1 |
44° 14’ 22.5”N |
Establish a port hand buoy equipped with a green lantern with flash characteristics: Fl 0.5 s, Ec 3.5 s. |
Crooked Channel |
5421.2 |
44° 13’ 36.8”N |
Establish an unlit starboard hand buoy. |
Crooked Channel |
5421.3 |
44° 13’ 37.9”N |
Establish an unlit port hand buoy in TN60’s former position. |
Crooked Channel |
5421.4 |
44° 13’ 47.5”N |
Establish an unlit starboard hand buoy. |
Crooked Channel |
5421.6 |
44° 13’ 56.7”N |
Establish an unlit starboard hand buoy. |
Crooked Channel |
5421.7 |
44° 14’ 04.7”N |
Establish an unlit port hand buoy. |
West Dublin |
5422.01 |
44° 14’ 25.9”N |
Change aid ID from TM51 to TS67. |
West Dublin |
5422.015 |
44° 14’ 27.0”N |
Establish an unlit starboard hand buoy. |
West Dublin |
5422.02 |
44° 14’ 28.4”N |
Change aid ID from TM54 to TS70. |
West Dublin |
5422.03 |
44° 14’ 31.4”N |
Change aid ID from TM55 to TS71. |
West Dublin |
5422.04 |
44° 14’ 37.6”N |
Discontinue buoy. |
Folly Channel North cardinal spar buoy TSB |
5422.1 |
44° 14’ 51.6”N |
Establish an unlit North cardinal buoy. |
Folly Channel North cardinal spar buoy TSC |
5422.2 |
44° 14’ 39.6”N |
Establish an unlit North cardinal buoy. |
Dublin Bay |
5422.3 |
44° 14’ 21.2”N |
Establish an unlit starboard hand buoy. |
Dublin Bay |
5422.4 |
44° 14’ 21.0”N |
Establish an unlit port hand buoy. |
Dublin Bay |
5422.5 |
44° 14’ 35.1”N |
Establish an unlit port hand buoy. |
Dublin Bay |
5422.6 |
44° 14’ 49.3”N |
Establish an unlit starboard hand buoy. |
Dublin Bay |
5422.7 |
44° 14’ 57.7”N |
Establish an unlit starboard hand buoy. |
Dublin Bay South cardinal spar buoy TSD |
5422.8 |
44° 14’ 52.6”N |
Establish an unlit South cardinal buoy. |
Dublin Bay |
5422.9 |
44° 15’ 07.4”N |
Establish an unlit starboard hand buoy. |
Bushen Island |
5423 |
44° 15’ 31.2”N |
Establish an unlit port hand buoy. |
Bushen Island |
5423.1 |
44° 15’ 31.0”N |
Establish an unlit starboard hand buoy. |
Crooked Channel |
5423.61 |
44° 13’ 49.9”N |
Discontinue buoy. |
Crooked Channel |
5423.62 |
44° 13’ 47.2”N |
Discontinue buoy. |
Crooked Channel |
5423.63 |
44° 13’ 37.9”N |
Discontinue buoy. |
Crooked Channel |
5423.64 |
44° 13’ 31.9”N |
Discontinue buoy. |
West Dublin |
5427.015 |
44° 15’ 30.9”N |
Discontinue buoy. |
West Dublin |
5427.025 |
44° 15’ 07.4”N |
Discontinue buoy. |
West Dublin |
5427.035 |
44° 14’ 52.6”N |
Discontinue buoy. |
Initial publication date: Friday, August 27, 2021
Comment submission
deadline: Thursday, November 25, 2021
(G2021-179, 180)
Inland Waters
Temporary Notices
*909(T)/14Kingston Harbour and Approaches/et les approches – Dock Unserviceable
Reference chart: 2017
The Kingston psychiatric hospital dock is unserviceable and
out of bounds for use as dockage until further notice.
(NOTSHIP C2409/10)
*1005(T)/15Port Dalhousie – East and West Piers: Access Forbidden
Reference chart: 2044
A recent engineering investigation identified structural issues
and safety concerns with both the East and West piers at Port
Dalhousie. In light of the inspection findings, the Department
of Fisheries and Oceans is taking action to protect the safety
of the public by prohibiting vessel, vehicular, and pedestrian
access to the piers.
Vessels can still safely navigate the waters surrounding the
piers, but will be unable to moor at the piers. The City of
St. Catharines will accommodate boaters as possible at other
local wharves.
Mark Sandeman
Area Manager, Client Services
Small Craft Harbours
Central & Arctic Region
Fisheries and Oceans Canada
3027 Harvester Road, Unit 310
Burlington, ON L7N 3G7
Telephone: (905) 639-2050
Facsimile: (905) 639-5975
Email: mark.sandeman@dfo-mpo.gc.ca
(NOTSHIP C567/15)
*515(T)/16Harbours on the East Shore of Lake Superior/Ports sur la rive est du lac Supérieur – Buoys Temporarily Discontinued
Reference chart: 2315
The Canadian Coast Guard has temporarily discontinued the
following aids to navigation:
XT1, XT2, XT3, XT4, XT5, XT6, XT7, XT8, XT9, XT10, XT11,
XT12.
(NOTSHIP C1045)
*814(T)/16Main Duck Island to/à Scotch Bonnet Island – Partially Submerged Fixed Steel Barges
Reference chart: 2060
There are 3 partially submerged fixed steel barges in North
end of West Lake (43° 57’ 02.3”N 077° 20’ 12.8”W), which have
been reported just below the water line.
Barges are marked with cautionary buoys.
(NOTSHIP C1641/14)
*1011(T)/16Lake Ontario/Lac Ontario (Western Portion/Partie Ouest) – Silting Reported
Reference chart: 2077
Silting reported in main entrance channel to Fifty Point
Marina. Centre of channel depth reported to be 1.9 metres
with shallower depths on the sides.
Mariners are requested to use caution in the area.
(NOTSHIP C2266/16)
*1218(T)/16Hamilton Harbour – Silting Reported
Reference chart: 2067
Silting reported along the North faces of Pier 11 and Pier
12:
Pier 11 North Face between positions 43° 16’ 31”N 079° 50’
56”W and 43° 16’ 29”N 079° 50’ 49”W, and at position 43° 16’
28”N 079° 50’ 42”W.
Pier 12 North Face between positions 43° 16’ 27”N 079° 50’
39”W and 43° 16’ 26”N 079° 50’ 33”W.
Mariners are requested to use caution and reduce speed upon
arrival and departure. Seaway draft will be affected when
water level is less than 0.70 metres above chart datum in
these areas.
(NOTSHIP C1831/13)
*1219(T)/16Toronto to/à Hamilton – Construction Operations
Reference chart: 2086
Construction operations taking place from November 14, 2016 until approximately 2026 at Lakeview Water Treatment Plant between Marie Curtis Park and Serson Creek. A variety of equipment will be used to expand the land mass along the shoreline. Landfill and 3 islands will be lit and marked.
(NOTSHIP C2533/16)
*108(T)/17Harbours in Lake Erie/Havres dans le lac Érié – Unlit Buoys Temporarily Repositioned
Reference chart: 2181
The following unlit spar buoys have been temporarily repositioned due to silting:
Aid Name |
LL # |
Temporary Changes |
ES2 |
7169 |
Reposition to 42° 39’ 10.0’’N 081° 12’ 32.0’’W |
ES3 |
7170 |
Reposition to 42° 39’ 15.4’’N 081° 12’ 40.7’’W |
ES4 |
7171 |
Reposition to 42° 39’ 16.8’’N 081° 12’ 37.7’’W |
The shallowest depth to 3.5M occurs between ES3 and ES4 with the deepest water off the red side of the channel. Mariners are requested to use caution in the area.
(B2017-003)
*309(T)/17Pelee Passage to/à la Detroit River – Low Water Levels Reported
Reference chart: 2123
Low water levels have been reported from the south end of the
entrance to Sturgeon Creek Harbour northward.
Annette Winter
Project and Divestiture Officer
Small Craft Harbours
Fisheries and Oceans Canada
Canada Centre for Inland Waters (CCIW)
867 Lakeshore Road
Burlington, ON L7S 1A1
Telephone: (905) 315-5286
Email: annette.winter@dfo-mpo.gc.ca
(NOTSHIP C58/13)
*1205(T)/17Toronto Harbour – Breakwater Entrance to Marina Closed Due to the Collapse of the Breakwater
Reference chart: 2085
The breakwater entrance to the west of Ontario Place Marina
has been closed due to the collapse of the breakwater.
Sub-surface hazards exist in the breakwater gap and on the
inner and outer edge of the breakwater wall.
Green spar buoy BW1 has been removed, and 3 white and orange
keep out markers have been placed in the breakwater
entrance.
The outer edge of the breakwater wall is marked with 2 white
and orange keep out markers.
The inner edge of the breakwater wall is marked with 3 white
and orange keep out markers.
(NOTSHIP C79/13)
*1206(T)/17Lake Rosseau and/et Lake Joseph – Unlit Buoy Temporary Established
Reference chart: 6022
The following unlit buoy has been temporary established:
Aid Name |
LL # |
Position |
P3/1 |
9089.1 |
45° 08’ 09.0’’N 079° 40’ 36.0’’W |
(D2017-006)
*709(T)/18Kingston Harbour and Approaches/et les approches – Information Regarding Mooring and Anchoring
Reference: Notice 309(T)/14 is cancelled.
Reference chart: 2017
All mooring or anchoring within the public port of Kingston is prohibited outside of designated marina areas until further notice without authorization from the port official.
Inquiries are to be directed to Transport Canada at (416) 952-0475.
*809(T)/18Cobourg to/à Oshawa – Dredging Operations
Reference chart: 2058
Dredging operations in Port Hope Harbour from August 3, 2018
until December 30, 2022. A wave attenuator will block the
entrance to the western basin.
Mariners are requested to stay clear of the area.
(NOTSHIP C1951/18)
*816(T)/19Point Clark to/à Southampton – Obstruction Below the Surface of the Water Reported
Reference chart: 2291
A fixed concrete obstruction just below the surface of the water has been reported in the Saugeen River west of highway 21 at the following position: 44° 30’ 01.7”N 081° 22’ 07.7”W. Mariners are requested to use caution in the area.
(NAVWARN NW-C-2508-15)
*1117(T)/19Lac Saint-Louis – Submerged Objects
Reference chart: 1430
Fifty-three anchorage blocks and chains reported on the
seabed in the vicinity of the Beauharnois Marina in the
following area:
Position
Pt 1: 45° 19’ 02.4”N 073° 52’ 34.0”W
Pt 2: 45° 19’ 02.3”N 073° 52’ 39.5”W
Pt 3: 45° 19’ 07.3”N 073° 52’ 39.7”W
Pt 4: 45° 19’ 07.3”N 073° 52’ 34.1”W
(NAVWARN NW-Q-1339-19)
*314(T)/20Toronto Harbour – Construction Operations
Reference: Notice 209(T)/20 is now cancelled.
Reference chart: 2085
Construction is taking place at Ashbridge's Bay and consists
of the construction of two breakwaters and of a landform. A
variety of equipment will be used, including tug boats and
barges. Temporary aids to navigation will be placed prior to
and during construction. The operations are scheduled to take
at the following positions:
Breakwater construction operations
43° 39’ 20.7”N 079° 18’ 48.1”W
Phase 1: 2020-04-01 through 2020-12-31
Phase 2: 2021-04-01 through 2021-12-31
Phase 3: 2022-04-01 through 2022-12-31
Landform construction operations
43° 39’ 01.4”N 079° 19’ 01.9”W
Implementation of the shoreline infill area is expected to take
approximately five years.
Mariners are requested to keep out of the construction zone.
*710(T)/20Murray Canal to Healey Falls Locks / Murray Canal aux Écluses de Healey Falls – Construction Operations
Reference chart: 2021
Construction operations, including diving operations, in
progress as of July 6, 2020 between 1100 UTC and 0100 UTC at
the mouth of the Trent River south of Dundas Street bridge in
Trenton. The site is marked with red, green and white markers.
Tug and barge on site, lit at night.
Vessels are advised to use caution when transiting the area
and to keep clear of construction operations. Call
416-729-8830 for further details.
(NW-C-1012-20)
*908(T)/20Smith Falls to/à Kingston including/y compris Tay River to/à Perth – Construction Operations
Reference chart: 1513
Temporary closures of up to 30 minutes are expected in the
navigation channel at the Third Crossing Bridge construction
site. Spotter boats will be positioned 100 metres north and
south of the bridge during work hours.
Installation of a temporary causeway is taking place between
44° 15.41'N 076° 28.78'W and 44° 15.52'N 076° 27.99'W.
(NW-C-3042-19, NW-C-1479-20)
*1012(T)/20Kingston Harbour and Approaches/et les approches – Construction Operations
Reference chart: 2017
Wharf construction is taking place daily from 1100 UTC to 2300 UTC at the Kingston-Wolfe Island ferry terminal. The ferry remains operational. Vessels are not permitted to dock on the south side. The construction area is marked and lit.
(NW-C-1786-20)
*1210(T)/20Demarcation Bay to/à Philips Bay – Mobile Offshore Drilling Unit Temporarily Established
Reference: Notice 616(T)/07 is cancelled.
Reference chart: 7661
The unmanned mobile offshore drilling unit “SDC” continues to be temporarily established at 69° 24.71’N 138° 53.76’W. The structure is 202.4 metres long and 53 metres wide.
For information, contact Captain Connelly at 1-250-598-4513 or 1-250-744-9818 or e-mail at doncon@islandnet.com or dcmarine@shaw.ca.
*112(T)/21Upper Gap to/à Telegraph Narrows – Construction Operations
Reference chart: 2006
Construction operations are currently underway on the Bay of
Quinte Skyway Bridge.
During these operations, lit barges are on site and the
bridge clearance is 19 metres.
(NW-C-2834-19)
*207(T)/21Kingston Harbour and Approaches/et les approches – Dredging Operations
Reference chart: 2017
Dredging operations are taking place between Kingston and Wolfe Island Monday to Saturday from 1100 UTC until 2300 UTC. Tug, barge and two dump scows are on site, monitoring VHF channels 16 and 06.
(NW-C-1238-20)
*413(T)/21Kingston Harbour and Approaches/et les approches – Aid to navigation temporarily unlit
Reference chart: 2017
The following aid to navigation is temporarily unlit:
Marysville Wharf light |
(LL 399.3): |
44° 11’ 42.4”N 076° 26’ 27.3”W |
(NW-C-1802-20)
*414(T)/21Toronto Harbour – Water Intake Pipes
Reference chart: 2085
Installation of marked water intake pipes is taking place until November 16, 2021 at the following positions:
Position 1: |
43° 39’ 03.1”N |
079° 20’ 49.8”W |
Position 2: |
43° 38’ 31.7”N |
079° 20’ 55.4”W |
Position 3: |
43° 38’ 51.4”N |
079° 21’ 14.6”W |
Position 4: |
43° 38’ 37.1”N |
079° 21’ 05.3”W |
Position 5: |
43° 38’ 35.6”N |
079° 21’ 14.9”W |
Position 6: |
43° 38’ 49.6”N |
079° 21’ 18.2”W |
Position 7: |
43° 39’ 08.2”N |
079° 20’ 55.7”W |
Position 8: |
43° 38’ 57.5”N |
079° 21’ 00.0”W |
Position 9: |
43° 38’ 40.2”N |
079° 20’ 40.3”W |
Position 10: |
43° 38’ 44.4”N |
079° 20’ 33.2”W |
Stay clear.
(NW-C-2263-20)
*707(T)/21Toronto Harbour – Drilling Operations
Reference chart: 2085
Drilling operations are taking place 2 NM south of Ashbridges
Bay, 24 hours per day since April 1st 2021. Tugs
Ecosse and Wyatt, barges and a dive boat with divers are on
scene.
Work area is marked by information and cautionary buoys.
Mooring buoy located at 43° 37’ 50.9”N
079° 18’ 56.9”W.
(NW-C-0255-21)
*810(T)/21Fort Frances to/à Hostess Island and/et Sandpoint Island – Aids to Navigation Temporarily Discontinued
Reference chart: 6108
The following aids to navigation are temporarily discontinued:
Aid Name |
LL # |
Position |
Noden Causeway East |
1465 |
48° 39’ 08.5”N 093° 18’ 47.6”W |
Noden Causeway West |
1466 |
48° 39’ 08.5”N 093° 18’ 49.1”W |
(D2021-026T, 027T)
Preliminary Notices
Central Region
Comment
Submission |
Comments should be directed to the following: |
*609(P)/21Britannia Bay à/to Chats Falls – Range Lights to be Discontinued
Reference chart: 1550
The Canadian Coast Guard proposes to permanently discontinue the following aids to navigation:
Aid Name |
LL # |
Position |
Baskin’s Beach front range |
(LL 1300) |
45° 28’ 46.6”N 076° 00’ 25.7”W |
Baskin’s Beach rear range |
(LL 1301) |
121° 19’ 338.0 m from front |
Initial publication date: Friday, June 25, 2021
Comment submission
deadline: Thursday, September 23, 2021
(D2021-023)
Pacific Coast
Temporary Notices
*610(T)/21Laredo Sound – Trial AIS Unit Installed
Reference chart: 3980
Jaffrey Rock light and whistle buoy E64 (LL 622- MMSI
993161103) has been equipped with AIS Aids to Navigation
System, providing position information. This system is part of
a Canadian Coast Guard trial.
Please visit http://www.marinfo.gc.ca/e-nav/
for more information about the trial.
Mariners are encouraged to submit their comments to Prince
Rupert MCTS Centre
(P2021-013)
*811(T)/21Plans - Stuart Channel – Marine Works
Reference chart: 3475
Log booming at 48° 59.672’N 123° 48.201’W to 49° 00.551’N 123°
49.510’W.
Hours of operation are Monday to Friday from 1300UTC until
0100UTC.
Caution. Minimum wake during hours of operation.
(NW-P-1003-21)
Preliminary Notices
Western Region
Comment
Submission |
Comments should be directed to the following:
A/Superintendent, Glenna Evans |
*611(P)/21Fraser River/Fleuve Fraser, Sand Heads to/à Douglas Island – Aids to Navigation to be Discontinued
Reference chart: 3490
The Canadian Coast Guard proposes to permanently discontinue the following aids to navigation:
Aid Name |
LL # |
Position |
Fraser River conical buoy S38 |
5237 |
49° 12’ 35.4”N 122° 53’ 24.7”W |
Brownsville light buoy S40 |
368.5 |
49° 12’ 42.4”N 122° 53’ 14.7”W |
Initial publication date: Friday, June 25, 2021
Comment submission
deadline: Thursday, September 23, 2021
(P2021-014, 015)
*612(P)/21Broughton Strait – Daybeacon to be Discontinued
Reference chart: 3546
The Canadian Coast Guard proposes to permanently discontinue the following aid to navigation:
Aid Name |
LL # |
Position |
Haddington Island west port bifurcation daybeacon |
5351 |
50° 36’ 08.4”N 127° 01’ 41.6”W |
Initial publication date: Friday, June 25, 2021
Comment submission
deadline: Thursday, September 23, 2021
(P2021-012)
*613(P)/21Canadian Coast Guard – Construction on Fixed Aids to Navigation
The Canadian Coast Guard will be rebuilding 40 aids to navigation structures from August 3rd 2021 to September 3rd 2021 in the following areas:
-Queen Charlotte Strait |
-Goletas Channel |
-Gordon Channel |
-Hardy Bay |
-Beaver Harbour |
-Wells Passage |
-Broughton Strait |
-Johnstone Strait |
-Boat Bay on West Cracroft Island |
|
During this refurbishment project, while an aid to navigation is temporarily demolished there will be a temporary measure in place and a NAVWARN will be issued accordingly.
For more information and to see the latest NAVWARN updates please visit:
https://nis.ccg-gcc.gc.ca/public/rest/messages/en/search
(P2021-016)
*812(P)/21Hugh Keenleyside Dam to/à Burton – Aids to Navigation to be Discontinued
Reference chart: 3056
The Canadian Coast Guard proposes to permanently discontinue the following aids to navigation:
Aid Name |
LL # |
Position |
Needles Sector |
29.5 |
49° 53’ 50.8”N 118° 05’ 04.5”W |
Upper Whatshan Sector |
30 |
49° 54’ 00.0”N 118° 04’ 41.8”W |
Lower Whatshan Sector |
31 |
49° 55’ 22.8”N 118° 03’ 15.7”W |
Initial publication date: Friday, August 27, 2021
Comment submission
deadline: Thursday, November 25, 2021
(P2021-017)
Other (T) & (P) Notices
Temporary Notices
*1105(T)/15Canada – Safety of Offshore Exploration and Exploitation Vessels
Reference: Notice 410(T)/2007 is cancelled.
2015 Annual Edition of Notices to Mariners, Notice No. 20,
pages A20-1 to A20-4.
Mariners are advised that offshore exploration and
exploitation vessels may be conducting drilling operations in
the following areas:
Gulf of St.
Lawrence
NIL
Mainland
NWT
NIL
Mackenzie Delta
NWT/Beaufort Sea
NIL
Arctic Islands of
the NWT/Arctic Islands of Nunavut
NIL
Eastern Arctic
Offshore
NIL
Davis
Strait
NIL
NOTE: Mariners are advised to obtain up-to-date position reports on drilling vessels and production installations before entering an area of exploration and exploitation. This information is available by contacting, as appropriate, ECAREG CANADA, NORDREG CANADA or CVTS OFFSHORE via any Marine Communications and Traffic Services Centre (MCTS).
(NOTSHIP M2215/15) (NEB)
*208(T)/21Canadian Coast Guard – Automatic Identification System (AIS)
Reference: Notice *819(T)/16 is cancelled.
AIS Aids to Navigation (AtoNs)
Mariners are advised that the Canadian Coast Guard (CCG) is continuing to conduct supervised test beds of AIS AtoNs, with the objective of bringing AIS AtoNs to Full Operational Capability (FOC). Specific information on AIS AtoN test bed sites can be found on the CCG e-Navigation Maritime Information Portal at http://www.marinfo.gc.ca/e-nav/docs/ais-aton-locations-eng.php.
Although AIS was originally developed as a collision avoidance tool for vessels, it also allows for the broadcasting of other types of data, such as the AIS AtoN “Message 21” (AIS AtoN Report).
Ships need to be equipped with standard shipborne AIS equipment for the display of AIS messages. The IMO mandatory carriage requirement for the Class “A” AIS display is the Minimum Keyboard Display (MKD), however, the display and use of the AtoN information may require additional hardware and/or software such as an AIS-connected Electronic Chart Display and Information System (ECDIS), Electronic Chart System (ECS), Radar or Portable Pilot Unit (PPU).
As the AIS information available to mariners will be dependent on their display system and its compliance with the latest IMO and IALA standards, some transmitted information may not be displayed or may have a different symbol. Mariners are encouraged to install and upgrade systems that provide AIS overlay on ECDIS, ECS and/or Radar. Mariners should be familiar with the display settings on their vessel’s shipborne equipment.
All geographical positions (latitude and longitude) are based on the WGS 84 datum; time is displayed in Coordinated Universal Time (UTC).
CCG is making every effort to broadcast quality information; however, as with any navigational tool, mariners should not rely on this information as their sole means of navigation.
Mariners are advised to consult the CCG e-Navigation web page on AIS AtoN, accessible at http://www.marinfo.gc.ca/e-nav/docs/ais-aton-index-eng.php for pertinent information, including examples of AIS AtoN display and symbology.
Individual NAVWARNs and/or NOTMARs are rarely issued for AIS AtoN trials.
Mariners are requested to provide feedback on the AIS AtoN test beds to the CCG e-Navigation Team at ccg.enav.gcc@dfo-mpo.gc.ca. In addition, mariners who wish to participate in CCG’s questionnaire on AIS AtoN are invited to access it at http://www.marinfo.gc.ca/e-nav/docs/asm-aton-survey-eng.php. The collected results will guide the CCG in further developing this information service.
Preliminary Notices
*614(P)/21Canadian Hydrographic Service – Raster Navigational Charts to be Discontinued
The Canadian Hydrographic Service (CHS) will commence the discontinuation, in progressive phases, of all of its digital Raster Navigational Charts (RNC) offered in BSB format.
CHS will support Global Navigation Satellite System (GNSS)
users by offering Electronic Navigational Charts (ENC) in S-57
format, as well as non-GNSS users by continuing to offer Paper
Charts.
To learn more about the advantages of ENC over RNC, please
visit
https://charts.gc.ca/charts-cartes/digital-electronique/raster-enc-eng.html.
Charts to be cancelled in the first phase of this initiative
are listed below. The areas listed have existing and
up-to-date ENC coverage.
Comments on this action are solicited from mariners and other
interested parties by Thursday, September 23, 2021, three
months following the initial publication date of Friday, June
25, 2021. Following this date, this notice will be
cancelled.
Any objections raised must state the facts on which they are
based and should include supporting information on safety,
commerce and public benefit. If you have an active
subscription to one of the charts below, it will be
automatically transferred to the ENC equivalent at no
additional cost.
Comments should be directed to the following email address: chsinfo@dfo-mpo.gc.ca.
BSB Chart |
Title |
|
BSB Chart |
Title |
RM-1201 |
Saint-Fulgence à/to Saguenay |
|
RM-1509 |
Rivière des Prairies |
RM-1202 |
Cap Éternité à/to St-Fulgence |
|
RM-1510 |
Lac des Deux Montagnes |
RM-1203 |
Tadoussac à/to Cap Éternité |
|
RM-1514A |
Carillon à/to l'Orignal |
RM-1220 |
Baie des Sept Îles |
|
RM-1514B |
L'Orignal à/to Papineauville |
RM-1221 |
Pointe de Moisie à/to Île du Grand Caoui |
|
RM-1515A |
Papineauville à/to Becketts Creek |
RM-1223 |
Chenal du Bic et les approches / and approaches |
|
RM-1515B |
Becketts Creek à/to Ottawa |
RM-1226 |
Mouillages et Installations Portuaires / Anchorages and Harbours Installations / Haute Côte-Nord |
|
RM-2000 |
Lake Ontario/Lac Ontario |
RM-1230 |
Plans Péninsule de la Gaspésie |
|
RM-2100 |
Lake Erie / Lac Érié |
RM-1233 |
Cap aux Oies à/to Sault-au-Cochon |
|
RM-2200 |
Lake Huron/Lac Huron |
RM-1234 |
Cap de la Tête au Chien au/to Cap aux Oies |
|
RM-2201 |
Georgian Bay/Baie Georgienne |
RM-1236 |
Pointes des Monts aux/to Escoumins |
|
RM-2300 |
Lake Superior / Lac Supérieur |
RM-1310 |
Port de Montréal |
|
RM-3410 |
Sooke Inlet to/à Parry Bay |
RM-1311 |
Sorel-Tracy à/to Varennes |
|
RM-3411 |
Sooke |
RM-1312 |
Lac Saint-Pierre |
|
RM-3412 |
Victoria Harbour |
RM-1313 |
Batiscan au/to Lac Saint-Pierre |
|
RM-3419 |
Esquimalt Harbour |
RM-1314 |
Donnacona à/to Batiscan |
|
RM-3424 |
Approaches to/Approches à Oak Bay |
RM-1315 |
Québec à/to Donnacona |
|
RM-3473 |
Active Pass |
RM-1316 |
Port de Québec |
|
RM-3477 |
Plans Gulf Islands |
RM-1317 |
Sault-au-Cochon à/to Québec |
|
RM-3478 |
Plans Saltspring Island |
RM-1320 |
Île Du Bic au/to Cap de la Tête au Chien |
|
RM-3479 |
Approaches to / Approches à Sidney |
RM-1350A |
Sorel-Tracy à/to Ruisseau Lahaise |
|
RM-3490 |
Fraser River/Fleuve Fraser - Sand Heads to/à Douglas Island |
RM-1350B |
Ruisseau Lahaise à/to Saint-Antoine-Sur-Richelieu |
|
RM-3491 |
Fraser River/Fleuve Fraser - North Arm |
RM-1350C |
Saint-Antoine-Sur-Richelieu à/to Île aux Cerfs |
|
RM-3492 |
Roberts Bank |
RM-1350D |
Île aux Cerfs à/to Otterburn Park |
|
RM-3493 |
Vancouver Harbour - Western Portion/Partie Ouest |
RM-1351A |
Bassin de Chambly à/to Île Sainte-Thérèse |
|
RM-3494 |
Vancouver Harbour - Central Portion/Partie Centrale |
RM-1351B |
Île Sainte-Thérèse à/to Pointe à la Meule |
|
RM-3495 |
Vancouver Harbour - Eastern Portion/Partie Est |
RM-1351C |
Pointe à la Meule à/to Pointe Naylor |
|
RM-3496 |
Approaches to / Approches à Vancouver Harbour |
RM-1351D |
Pointe Naylor au Lac/to Lake Champlain |
|
RM-3534 |
Plans Howe Sound |
RM-1360 |
Lac Memphrémagog |
|
RM-3721 |
Plans - Pitt Island |
RM-1429 |
Canal de la Rive Sud |
|
RM-3726 |
Laredo Sound and approaches |
RM-1430 |
Lac Saint-Louis |
|
RM-3727 |
Cape Calvert to Goose Island Including Fitz Hugh Sound |
BSB Chart |
Title |
|
BSB Chart |
Title |
RM-3728 |
Milbanke Sound and approaches / et les approches |
|
RM-4448 |
Port Hood and/et Mabou Harbour |
RM-3744 |
Queen Charlotte Sound |
|
RM-4452 |
Havres et Mouillages / Harbour and Anchorages |
RM-3902 |
Hecate Strait |
|
RM-4453 |
Île à la Brume à/to Pointe Curlew |
RM-4024 |
Baie des Chaleurs / Chaleur Bay aux / to Îles de la Madeleine |
|
RM-4454 |
Pointe Curlew à/to Baie Washtawouka |
RM-4025 |
Cap Whittle à/to Havre Saint-Pierre et/and Île D'anticosti |
|
RM-4455 |
Baie Washtawouka à/to Baie Piashti |
RM-4026 |
Havre-Saint-Pierre et/and Cap des Rosiers à/to Pointe des Monts |
|
RM-4456 |
Baie Piashti à/to Petite Île au Marteau |
RM-4002 |
Golfe Du Saint-Laurent / Gulf Of St. Lawrence |
|
RM-4459 |
Summerside Harbour and approaches / et les approches |
RM-4022 |
Cabot Strait and approaches / Détroit de Cabot et les Approches |
|
RM-4460 |
Charlottetown Harbour |
RM-4023 |
Northumberland Strait / Détroit de Northumberland |
|
RM-4462 |
St George's Bay |
RM-4275 |
St. Peters Bay |
|
RM-4463 |
Chéticamp to/à Cape Mabou |
RM-4276 |
Little Bras D'or |
|
RM-4464 |
Chéticamp to / à Cape St Lawrence |
RM-4277 |
Great Bras D'or |
|
RM-4466 |
Hillsborough Bay |
RM-4278 |
Great Bras D'or and / et St Patricks Channel |
|
RM-4468 |
Île Du Petit Mécatina aux / to Îles Sainte-Marie |
RM-4279 |
Bras D'or Lake |
|
RM-4469 |
Île Plate à/to Île Du Petit Mécatina |
RM-4301 |
Canso Harbour to / au Strait Of Canso |
|
RM-4474 |
Îles Bun à/to Baie Des Moutons |
RM-4302 |
Strait Of Canso |
|
RM-4483 |
Caribou Harbour |
RM-4363 |
Cape Smokey to / à St Paul Island |
|
RM-4485 |
Cap Des Rosiers à/to Chandler |
RM-4365 |
Ingonish Harbour and approaches/et les approches |
|
RM-4486 |
Baie Des Chaleurs / Chaleur Bay |
RM-4367 |
Flint Island to / à Cape Smokey |
|
RM-4498 |
Pugwash Harbour and approaches / et les approaches |
RM-4403 |
East Point to / à Cape Bear |
|
RM-4669 |
Red Bay |
RM-4404 |
Cape George to / à Pictou |
|
RM-4905 |
Cape Tormentine à/to West Point |
RM-4405 |
Pictou Island to / aux Tryon Shoals |
|
RM-4906 |
West Point à/to Baie De Tracadie |
RM-4406 |
Tryon Shoals to / à Cape Egmont |
|
RM-4909 |
Détroit De Northumberland/Northumberland Strait Partie Ouest/Western Portion |
RM-4416 |
Havre de Gaspé |
|
RM-4911 |
Entrée à / Entrance to Miramichi River |
RM-4428 |
Havre de Natashquan et les approches / and approaches |
|
RM-4912 |
Miramichi |
RM-4429 |
Havre Saint-Pierre et les approches / and approaches |
|
RM-4913 |
Caraquet Harbour Baie De Shippegan et / and Miscou Harbour |
RM-4430 |
Plans - Île D'anticosti |
|
RM-4920 |
Plans: Baie Des Chaleurs / Chaleur Bay: Côte Sud / South Shore |
RM-4432 |
Archipel de Mingan |
|
RM-4921 |
Plans Baie Des Chaleurs/Chaleur Bay - Côte Nord/North Shore |
RM-4440 |
Îles Sainte-Marie à/to Île à la Brume |
|
RM-4935 |
Murray Harbour to/à Boughton Bay |
|
|
|
|
|
BSB Chart |
Title |
|
BSB Chart |
Title |
RM-4938 |
Pictou Harbour and East River Of Pictou |
|
RM-6100B |
Rivière Mistassini |
RM-4950 |
Îles De la Madeleine |
|
RM-6100C |
Rivière Péribonka |
RM-4954 |
Chenal Du Havre De la Grande Entrée |
|
RM-6100D |
La Grande Décharge et les approches/and approaches |
RM-4955 |
Havre-aux-Maisons |
|
RM-7220 |
Lancaster Sound Eastern approaches/approches Est |
RM-4956 |
Cap-aux-Meules |
|
RM-7310 |
Jones Sound |
RM-4957 |
Havre-Aubert |
|
RM-7568 |
Lancaster Sound and/et Admiralty Inlet |
RM-4969 |
Île Mistanoque aux / to Îles Mack |
|
RM-7569 |
Barrow Strait and/et Wellington Channel |
RM-4970 |
Baie De Bonne-Espérance à/to Île Mistanoque |
|
RM-7573 |
M'clintock Channel Larsen Sound and/et Franklin Strait |
RM-4971 |
Blanc-Sablon à/to Baie De Bonne-Espérance |
|
RM-7620 |
Demarcation Bay to/à Liverpool Bay |
RM-5505 |
Bélanger Island à/to Cotter Island |
|
RM-7621 |
Amundsen Gulf |
RM-6100A |
Lac Saint-Jean |
|
RM-7950 |
Jones Sound Norwegian Bay and / et Queens Channel |